Bradford White BWCH Operations Instructions Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
Page 18
BRADFORD WHITE CORP.
LEGEND
CHECK VALVE
THERMOMETER
TEMPERATURE
SENSOR
GLOBE VALVE
EXPANSION TANK
WITH AIR SCOOP AND
AUTO AIR VENT
3-WAY VALVE
VALVE
CAUTION: THIS DRAWING SHOWS SUGGESTED
PIPING CONFIGURATION AND VALVING, CHECK
WITH LOCAL CODES AND ORDINANCES FOR
ADDITIONAL REQUIREMENTS.
PRESSURE REDUCING VALVE
W/ FAST FILL BYPASS
PURGE
VALVE
PUMP
PRIMARY/SECONDARY MANDITORY FOR ALL
VARIABLE FLOW SYSTEMS
INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM
PIPING&SIZING OF EXPANSION TANK
PER TANK MANUFACTURER'S INSTRUCTIONS
DIMENSION "C" (COMMON PIPING) TO BE FOUR
PIPE DIAMETERS, MAX. (NO ELBOWS OR VALVES)
BOILER CIRCUIT PIPING MUST BE EQUAL
TO BOILER WATER CONNECTION SIZE
BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER
DOTTED DEVICES INDICATE ALTERNATE LOCATIONS
PUT BOILER CONTROL SENSOR IN THE SYSTEM
C
PUMP LOCATION FOR PUMP-MOUNTED UNITS
SYSTEM PUMP
MAKE-UP
COLD WATER
SUPPLY
SYSTEM
PUMP LOCATION FOR
NON-PUMP-MOUNTED UNITS
RETURN
SYSTEM
SUPPLY WHEN USING THIS PIPING STYLE.
MINIMUM BOILER INLET WATER TEMPERATURE
MUST BE AT LEAST 120°F.
Figure 7. Hydronic Piping - Primary-Secondary, Reverse-Return.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 63 64

Comments to this Manuals

No comments