Bradford White BWCH Operations Instructions Page 36

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 35
Page 36
BRADFORD WHITE CORP.
SECTION 6.
Operating Instructions
6.1 Sequence of Operation
A call for heat can be initiated either
automatically (auto mode) under thermostatic control
by the Copper Brute II temperature control, or by an
external contact closure (manual mode).
In auto mode, the Copper Brute II burner will
re its stages of input to maintain a target temperature
programmed into the temperature control. The
controller can be programmed per Section 6.3.
In manual mode, an external control will control
the Copper Brute II stages, as long as the Copper
Brute II control is set to mode 6, and the auto/manual
switch (located inside the control compartment) is set
to manual.
The amber
READY light on the front panel
indicates that the control system is energized. Upon
a call for heat, the green
HEAT indicator on the front
panel will light.
If the unit is pump-mounted, the pump will be
energized. The pump terminals on the eld-wiring
terminals strip will energize a eld pump that is
properly interlocked with the Copper Brute II. The
green
PUMP indicator on the front panel will light.
Once the water ow switch makes, and if all of
the safety interlocks are closed, the ignition module
will energize the blower(s) for a 15-second pre-purge,
followed by a 20-second period to allow the ignitor to
heat.
Energizing the blower pressurizes the air box
(which supplies air to the burners) and closes the
normally-open contact(s) of the airow pressure
switch(es). This allows the ignition module to proceed
with the ignition sequence.
The blocked ue pressure switch senses the
pressure in the plenum. It will interrupt the airow
sensing circuit if this pressure exceeds a maximum
value. If airow is not proven, the ignition module
will lockout.
The ignition module checks that the ignitor
current has reached a minimum value and energizes
the gas valve at the end of the ignitor heating period.
The green
STAGE 1 indicator on the front panel will
light, indicating that the stage 1 gas valve is open.
After a 4-second trial for ignition, the ignitor
switches off, and unless a ame is detected by the
ame sensor, the gas valve will close and the ignition
module will either attempt ignition again (up to three
times) or will lockout (if the optional lockout ignition
module is used).
If ame is sensed, the burner will continue to
re as long as there is a call for heat. In Auto mode,
additional stages are delayed by a minimum of 60
seconds (less prepurge and ignitor warm-up time) and
once energized, must re for at least 30 seconds. The
request for additional stages is indicated on the control
display, and the energizing of additional burner stages
is indicated by front panel lights.
If there is a subsequent loss of ame signal, the
burner will attempt re-ignition up to three times (only
once if optional lockout ignition module is used.)
When the call for heat is satised, the gas
valve(s) closes and the blower(s) continues to run
for 30 seconds. The pump will continue to run for a
minimum of 20 seconds and up to a programmable
maximum of 10 minutes.
If a call for heat is prevented from being satised
either by a safety interlock or due to an ignition
lockout, the red
SERVICE indicator on the front panel
will light. To reset the standard ignition module,
the reset button on the module must be pressed.
Interrupting power to this module will not reset the
lockout.
The Copper Brute II 1000–2000 models have
two ignition modules that control different burners. If
one module should fail for any reason, the remaining
module can operate its burner(s) independently.
6.2 Filling the Boiler System
1. Ensure the system is fully connected. Close all
bleeding devices and open make-up water valve.
Allow system to ll slowly.
2. If make-up water pump is employed, adjust
pressure switch on pumping system to provide
a minimum of 12 psi (81.8 kPa) at the highest
point in the heating loop.
3. If a water pressure regulator is provided on the
make-up water line, adjust the pressure regulator
to provide at least 12 psi (81.8 kPa) at the highest
point in the heating loop.
4. Open bleeding devices on all radiation units
at the high points in the piping throughout
the system, unless automatic air bleeders are
provided at such points.
5. Run system circulating pump for a minimum of
30 minutes with the boiler shut off.
6. Open all strainers in the circulating system,
check ow switch operation, and check for
debris. If debris is present, clean out to ensure
proper circulation.
7. Recheck all air bleeders as described in Step 4.
8. Check liquid level in expansion tank. With the
system full of water and under normal operating
pressure, the level of water in the expansion tank
should not exceed ¼ of the total, with the balance
lled with air.
9. Start up boiler according to the procedure in this
manual. Operate the entire system, including the
pump, boiler, and radiation units for one (1) hour.
10. Recheck the water level in the expansion tank. If
the water level exceeds ¼ of the volume of the
expansion tank, open the tank drain, and drain to
that level.
11. Shut down the entire system and vent all
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 63 64

Comments to this Manuals

No comments