Bradford White BWCH Operations Instructions Page 41

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 40
Page 41
COPPER BRUTE II (500 - 2000)
Caution
If the tank temperature control is set too high, a
potential for hot water scalding may exist.
Mode 2: Primary secondary piping.
Install a “supply sensor” in the primary loop
using the Bradford White part number R2014800
sensor (included with every Copper Brute II unit).
Connect the sensor to the “S C2” and “SUP S”
terminals.
You must provide an indication of the system’s
heat demand by removing the jumper across the
“ComD” and “HtD” terminals on the eld wiring
panel and connecting a zone valve or zone pump end
switch, thermostat, aquastat or other contact closure to
these terminals. If the “ComD” and “HtD” terminals
are left jumpered, the control will always see a heat
demand and remain in “Dem” mode, with the boiler
pump running continuously. See Section 5.2 for more
information.
A secondary aquastat, such as for a separate heat
exchanger for DHW, can be connected to the “Set D”
and “Com D” terminals. A call for heat from these
controls will start the boiler pump and cause the boiler
to re.
If the boiler is not a pump mounted model, a
24VAC pump contactor may be connected to the
“PMP” terminals to control a eld installed pump.
Program the temperature control to use Mode 2.
The
AUTO/MAN switch must be in the AUTO position in
this mode.
Mode 4:
Hydronic outdoor reset system
without primary / secondary piping.
Bradford White strongly suggests the use of
primary secondary piping with the Copper Brute II
boiler. This piping style best ensures that the Copper
Brute II will have proper water ow. However, non-
primary secondary methods can be used successfully,
so this section has been included.
Install the outdoor reset sensor, Bradford White
part number R2014000, and connect the leads to the
“OD S” and “S C2” terminals.
You must provide an indication of the system’s
heat demand by removing the jumper across the
“ComD” and “HtD” terminals on the eld wiring
panel and connecting a zone valve or zone pump end
switch, thermostat, aquastat or other contact closure to
these terminals. If the “ComD” and “HtD” terminals
are left jumpered, the control will always see a heat
demand and remain in “Dem” mode, with the boiler
pump running continuously. See Section 5.2 for more
information.
Reset Override: An additional thermostat or aquastat
may be connected to the “Set D” and “Com D”
terminals. A call for heat from either of these controls
will start the boilers pump and cause the boiler to re.
If the boiler is not a pump mounted model, a
24VAC pump contactor may be connected to the
“PMP” terminals to control a eld installed pump.
Program the temperature control to use Mode 4.
The
AUTO/MAN switch must be in the AUTO position in
this mode.
Mode 5:
Primary secondary piping with
outdoor reset.
Install the outdoor reset sensor, Bradford White
part number R2014000, and connect the leads to
the “OD S” and “S C2” terminals. Install a “supply
sensor” in the primary loop using the Bradford White
part number R2014800 sensor (included with every
Copper Brute II unit). Connect the sensor to the “S
C2” and “SUP S” terminals.
You must provide an indication of the system’s
heat demand by removing the jumper across the
“ComD” and “HtD” terminals on the eld wiring
panel and connecting a zone valve or zone pump end
switch, thermostat, aquastat or other contact closure to
these terminals. If the “ComD” and “HtD” terminals
are left jumpered, the control will always see a heat
demand and remain in “Dem” mode, with the boiler
pump running continuously. See Section 5.2 for more
information.
A secondary aquastat, such as for a separate heat
exchanger for DHW, can be connected to the “Set D”
and “Com D” terminals. A call for heat from these
controls will start the boiler pump and cause the boiler
to re.
If the boiler is not a pump mounted model, a
24VAC pump contactor may be connected to the
“PMP” terminals to control a eld installed pump.
Program the temperature control to use Mode 5.
The
AUTO/MAN switch must be in the AUTO position in
this mode.
Mode 6:
Boiler with external staging control
(multiple boiler control, building
automation system, energy
management system, etc.)
Leave the jumper installed between “Ht D” and
“Com D” terminals. There are terminals on the eld
wiring panel that must be wired per the instructions in
Section 5.3 of this manual. Other wiring methods
may be unsafe. The wiring in Section 5.3 of this
manual must be used.
The
AUTO/MAN switch is located on the circuit
board in the slide-out control panel on the front of the
Copper Brute II. This switch is placed in the manual
position
(MAN) when an external control is controlling
the Copper Brute II stages.
Program the temperature control to use Mode
6. Mode 6 tells the Copper Brute II control that an
external staging control is being used.
Page view 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 63 64

Comments to this Manuals

No comments